// FULL-CYCLE ENGINEERING · SINCE 2020

Refineries and hydropower,
designed in modules.

Four refineries delivered 2020–2026, +14 M t/year. The same method, proposed for low-head hydropower.

SCROLL 42.0981° N / 88.2829° W — WEST DUNDEE, IL

// WHAT WE DO — TWO BUSINESS LINES

01// DELIVERED 2020–2026

Oil refining — MRUS

Modular refineries on MRUS technology (Multifractional Separation of Crude Hydrocarbons): a 30+ column cascade that separates crude into superpure hydrocarbon components.

+14M t/yearCrude-processing capacity delivered
up to80%Light-product yield, Light Sweet crude
5–7×Profitability, superpure hydrocarbons
02// PROPOSED CAPABILITY

Small hydropower

Modular low-head plants that stay inside the river channel — no reservoir, no land acquisition. A proposed scheme, assessed site by site.

up to5 mHead at the modular overflow weir
up to−40%Construction cost vs a conventional scheme
3–6 yearsPayback (conventional 10–15 years)

// The company

Full cycle — design · equipment · construction · start‑up · staff training · operationFull cycle — design to operation

  • 2020Founded
  • 2officesWest Dundee · Moscow
  • 4refineriesDelivered 2020–2026
About & Contact →
// PROJECTS OMSK +4 · TSELINSKY 5 · YAROSLAVL +3 · UFA +2 M t/year All projects